When a single-lane temporary road cannot adequately handle the traffic, two-lane temporary roads will be used. 1. Geometry. In the transition area from the existing highway to the temporary road, the horizontal curvature should be designed so that the operating speed of a vehicle will be reduced by no more than 25 km/h (15 mph).