The formation or nstruction of the subgrade begins after the clearing and grubbing (stump removal) phase. Three basic nstruction techniques are mm used: side cast fills and/or wasting, full bench nstruction with end haul, and balanced road sections with excavation incorporated into layered fills (Figure 110).